Acceptance Test Komax Services

Your Benefit

  • Seamless integration of a new system into your production process

  • Installation of the system only after successful customer acceptance

  • No production interruptions

  • No subsequent fine-tuning

  • Optimally trained personnel

Description

Complex custom systems generally have a substantial set of specifications to fulfill. If you only notice that something doesn’t work as envisioned when the on-site installation takes place, the requisite corrective work can only be carried out at the manufacturer’s location in many cases. This means production downtime and lost time. With the Acceptance Test, all functions are tested during the production process at our facility. Any refinements and optimization take place before installation – so you can be sure that your new system fulfills all specifications.


Scope of services

  • Individual definition of the Acceptance Test prior to installation of the machine
  • Typical customer acceptance process:
  • Initial inspection of the main components after assembly
  • Test of the system at Komax with customer material (with customer present)
  • If necessary: corrections and final adjustment
  • Acceptance in collaboration with the customer
  • Delivery and installation of the system at the customer’s plant
  • If necessary: further tests and optimization after installation of the system