Komax Relocation
40 years cutting edge

Komax Relocation

Technical Support + Maintenance

The benefit to you

  • Shortened planning times
  • Fast response to production bottlenecks
  • Comprehensive support by Komax with acquisition, transport, repair and installation
  • On-site instruction of your operating and maintenance staff by Komax engineers
  • Lower investment volume compared to new acquisitions
  • Support with the identification of used machines and test systems across the worldwide Komax network
 

You produce at various locations and want to deploy your machines and test systems where they are currently needed? Our relocation service overhauls, transports and installs your complete Komax equipment set.

Your requirements

  • I want to boost our capacity as quickly and cheaply as possible
  • I want to make better use of our existing resources
  • I want to be sure that the machine arrives at the new location ready for production

Description

For companies with multiple production locations, it is not uncommon for some locations to be working non-stop while others have free capacities. Rather than increasing production capacity through the purchase of new equipment, shifting under-utilized production equipment within the company can be a good option. With our relocation service, Komax guarantees the flawless condition of the machines and test systems after the move to the new location – so they can be used in production right away. We put the machinery into operation and instruct the operating personnel at the new location.

Komax Relocation is also the perfect solution when you buy used Komax machines or test systems: there’s no risk for you because we inspect and repair the equipment.  

Availability

  • Komax
  • TSK
  • Kabatec

Scope of services

  • Inspection of the machines and test systems at the old location and creation of documentation of the machine condition (Condition Report) by Komax specialists
  • Determination of any necessary repair work with the customer (generally maintenance, re-certification of quality devices and/or upgrade of hardware and software)
  • Execution of the defined tasks, acceptance and reporting at the old location as well as packing and sealing the transport units by Komax specialists
  • Transport and installation of the machines and test systems at the new location by Komax
  • Instruction of the operating personnel at the new location by Komax specialists